Top 8 Microsoft Project Alternatives in 2026

By Joe Weller | May 17, 2017 (updated January 27, 2026)

Microsoft Project Online will retire on September 30, 2026. We’ve compared the top eight Microsoft Project Alternatives for 2026 to help you prepare for your team’s transition.

Here’s how each of these tools stands out:

  • Smartsheet is best for cross-functional, operational, or PMO-led teams that need Microsoft Project-style Gantt scheduling with stronger collaboration, automation, and reporting.
  • Asana is best for knowledge-work teams that want a simpler alternative to MS Project, with task-level collaboration, automation, and portfolio visibility.
  • ClickUp is best for fast-moving teams that want MS Project-style timelines in a highly configurable workspace rather than a traditional, PMO-centric scheduling tool.
  • Microsoft Planner is best for Microsoft 365-centric teams that need a task-first alternative for lightweight planning, team coordination, and visibility inside Microsoft Teams.
  • monday.com is a no-code PM platform best suited for cross-functional teams that want MS Project-style timeline visibility, but prioritize ease of use over PMO-grade scheduling rigor.
  • OpenProject is an MS Project alternative for engineering, IT, and public-sector teams that need open-source or EU-hosted project scheduling with granular permissions and robust reporting.
  • Wrike is a good alternative for cross-functional or PMO-led teams that need enterprise-grade security, built-in AI assistance, and flexible views, without the rigidity of a PM-only desktop tool.
  • Zoho Projects is a solid alternative for small to mid-sized teams that need Gantt-based planning, multiple work views, and enterprise security, without the complexity of a PMO scheduling tool.

Whatever your team’s most important features may be, this guide can help you make the case for switching from Microsoft Project.

Smartsheet

Smartsheet is a powerful, cloud-based alternative to Microsoft Project Online. The intelligent work management platform combines the ease of use with enterprise-grade project controls. Unlike the rigid, file-based structure of Microsoft Project, Smartsheet offers a flexible environment where teams can switch instantly between Grid, Gantt, Card, Board, and Timeline views without losing data integrity.

An collage of product screens showcasing the PPM workflow within the Smartsheet application.

Here are some features available to Smartsheet users:

  • Cross-sheet formulas and cell linking
  • No-code automated workflows, including update requests and approval requests
  • Unlimited free viewers on any plan and free guests on Business, Enterprise and Advanced Work Management plans, plus published sheets, reports, and dashboards for read-only access
  • Smart Columns that apply AI directly within sheets to categorize data, analyze sentiment, translate text, and extract structured information from cells
  • Enterprise-grade security controls including SSO (SAML/OAuth), role-based permissions, encryption at rest and in transit, audit logs, data retention controls, and optional customer-managed encryption keys
  • Low-barrier project setup using tables and inline editing instead of rigid project schemas
  • Interactive Gantt charts with drag-and-drop scheduling, task dependencies, milestones, and baselines
  • Dashboards that are updated in real time
  • Multiple synchronized views (Grid/Table, Gantt, Timeline, Board, Card, Calendar) on the same project data without duplication or restructuring
  • Native import of Microsoft Project files (.mpp, .mpx, .mspdi, .xml) into new sheets   Export function to PDF, Excel, Google Sheets, and Microsoft Project (XML) for reporting and interoperability  

What sets Smartsheet apart from other alternatives is its ability to scale portfolio governance through the Control Center, which automates project provisioning and global updates across hundreds of active sheets simultaneously. The enterprise-grade, purpose-built platform centralizes work, automates processes, and eliminates the need to piece together multiple Microsoft tools. Smartsheet also uses DataTable to bridge the gap between project management and data science. This allows teams to manage millions of rows and sync them with external systems like SAP or Salesforce via Data Shuttle. These native automations and no-code workflows, such as automated approval requests and cross-sheet cell linking, provide a level of real-time collaboration and data interoperability that traditional project tools often lack.

Learn more about the different features Smartsheet has to offer as a PPM software and as a project management software.

Asana

Asana shifts the focus from rigid, top-down scheduling to flexible, real-time team execution. It provides a centralized Work Graph that connects tasks across departments, making it more flexible than the file-based architecture often associated with classic Microsoft Project. Asana’s cloud-native architecture ensures that every stakeholder remains aligned within a single workspace.

asana dashboard

Here are some features available to Asana users:

  • Enterprise-grade security features including SSO, SCIM, audit logs, data residency, encryption, and admin controls
  • Task list–first interface with optional board, calendar, and timeline views for the same project
  • One-click view switching, drag-and-drop task management, and minimal setup
  • Interactive Timeline (Gantt) view with drag-and-drop scheduling and dependency-based auto-adjustments
  • List, board, calendar, or timeline project views with customizable fields and saved layouts
  • CSV exports for projects and organizational data
  • Standardized work requests with custom forms that feed directly into projects  

Asana sets itself apart through multi-homing, a feature that allows a single task to exist in multiple projects simultaneously so that updates sync instantly. Unlike the static reporting in Microsoft Project, Asana offers native Goals that update automatically based on real-time task progress. AI Studio also allows teams to build custom no-code agents to automate complex workflows, while maintaining a task-first interface that can be switched between List, Board, Timeline, and Gantt views.

Learn about the project timeline software features Smartsheet has to offer.

ClickUp

ClickUp consolidates project scheduling, document collaboration, and resource management into a single platform. While Microsoft Project often requires specialized training and is tailored for structured, top-down planning, ClickUp is designed for cross-functional teams that require both high-level visibility and day-to-day agility. 

clickup dashboard

Here are some features available to ClickUp users:

  • Unlimited free guests with view-only access on paid plans 
  • AI-powered custom fields that can automatically generate summaries, categorize tasks, translate content, and create updates within columns
  • Enterprise-grade security including SOC 2 compliance, SSO and SCIM provisioning, role-based permissions, and regional data residency options available
  • Familiar spreadsheet-style layout with rows and columns
  • Drag-and-drop editing, column pinning, and inline updates
  • Interactive Gantt view with drag-and-drop timelines, task dependencies, and real-time schedule adjustments
  • Export capabilities for tasks, views, dashboards, and Docs to formats including PDF, CSV/Excel, HTML, and Markdown

ClickUp offers powerful features such as an interactive Gantt view with real-time dependency shifting and native time tracking, eliminating the need for the fragmented toolsets often paired with Microsoft Project. The platform’s ClickUp Brain AI automates status updates and summarizes task data directly within spreadsheet-style table views, which support drag-and-drop editing and column pinning. ClickUp provides the robust administrative controls necessary in highly regulated environments.

Microsoft Planner

Microsoft Planner is a task-first alternative to Microsoft Project, designed for teams that require organization without the steep learning curve of traditional PM software. It works for collaborative business teams, marketing groups, and operational units. It offers users quick setup, low overhead, and a familiar Microsoft 365 interface.
microsoft planner dashboard

Here are some features available to Microsoft Planner users:

  • Options for external guests to be added as users to view and collaborate on tasks
  • Enterprise security, compliance, and data protection controls, including identity management, access controls, and governance covered by Microsoft Product Terms
  • Familiar Microsoft 365 interface that is deeply integrated into Microsoft Teams
  • Task-first tool designed for quick setup and low overhead
  • Board, Grid, Schedule, Charts, with Timeline, People, and Goals views available
  • Plan and exports to Excel

The platform’s greatest advantages are its unified task aggregation and the Premium capabilities unlocked with a Premium license, such as the interactive Timeline (Gantt) view and task dependencies. Planner offers zero-configuration enterprise security and native integration with Microsoft Loop and Teams, allowing tasks to sync live across documents and chats. This ensures that project data remains governed by Microsoft Product Terms while providing real-time collaboration.

monday.com

monday.com is a Work OS designed for cross-functional teams that prioritize visual clarity and rapid adoption. While Microsoft Project is built for specialized project managers handling traditional Waterfall schedules, monday.com is suited for Agile, creative, and operationally diverse teams who need to collaborate in real-time without extensive technical training. 
monday dashboard   

Here are some features available to monday.com users:

  • Guest collaboration via Shareable Boards
  • AI-powered column actions and AI blocks that can generate, summarize, classify, and refine content directly within boards
  • Enterprise-grade security with ISO 27001, SOC 1/2/3, GDPR, HIPAA, and CCPA compliance
  • Familiar spreadsheet-style, column-based interface
  • No-code, drag-and-drop experience to build workflows, automations, and views
  • Interactive Gantt Chart view that updates dynamically
  • Customizable board views per board, including Table, Gantt, Kanban, Calendar, Dashboard, and Workload views
  • Board exports to Excel; dashboards and Workdocs exports to PDF; full account data exports via ZIP files

monday.com has AI Blocks integrated into the OS to automate complex tasks like predictive capacity planning, risk identification, and the generation of entire project plans from natural language prompts. It offers over 200 vertical-specific templates and interactive Gantt charts that dynamically sync with a wide array of visual views, including Kanban, Workload, and Dashboards. Monday workdocs also allow teams to embed live project widgets directly into collaborative documents.

Learn more in this guide to the best project management software of 2026.

OpenProject

OpenProject is an open-source alternative to Microsoft Project. It’s suitable for security-conscious organizations, public sector entities, and complex industries like construction that demand full control over their data and project methodologies. By offering both cloud and self-hosted on-premises deployment, it provides a level of digital sovereignty.

openproject dashboard

Here are some features available to OpenProject users:

  • Enterprise-grade security features including enforced two-factor authentication, SAML single sign-on and LDAP integration, encrypted data in transit and at rest, and regular cloud backups
  • Spreadsheet-style work package tables with configurable columns, filters, hierarchies, and grouping, alongside optional board-style views for Agile teams
  • Clearly defined modules for work packages, timelines, boards, calendars, and reporting
  • Interactive Gantt chart module
  • Custom views across tables, boards, calendars, team planners, and Gantt charts
  • Work package, report, and timeline exports to PDF, Excel, and CSV, including printable Gantt charts and time-and-cost reports

OpenProject boasts integrated features that go beyond standard scheduling, such as native meeting management with linked agendas and a specialized BIM module for viewing 3D building models directly within the interface. While some users may find that the Microsoft Project suite of collaboration tools can be fragmented, OpenProject consolidates interactive Gantt charts, status boards, and time-and-cost reporting into a single, transparent environment.

You can also learn about the robust task management software features Smartsheet has to offer. 

Wrike

Wrike bridges the gap between large-scale enterprise planning and Agile team execution. It is well-suited for cross-functional teams in marketing, professional services, and PMOs that require high-level visibility without the steep learning curve or siloed nature of traditional legacy tools. 
   wrike dashboard

Here are some features available to Wrike users:

  • Free viewers with view and comment access for stakeholders
  • Built-in generative AI for creating and editing task descriptions, project plans, summaries, and comment digests
  • Role-based access control, selective sharing, double encryption, customer-managed encryption keys, and enterprise compliance certifications (SOC 2 Type II, ISO standards)
  • Spreadsheet-like Table view and familiar Kanban boards, along with List, Gantt, Calendar, and Dashboard views
  • Drag-and-drop boards, structured tables, and configurable views intended to reduce complexity
  • Interactive Gantt charts with dependencies, critical path analysis, baselines, and snapshots for schedule tracking
  • Direct import of Microsoft Project files (.MPP, .MPX, .XML), preserving tasks, durations, dependencies, and owners
  • Support for exporting Gantt charts and reports to PDF and task data to Excel

Wrike features cross-tagging, which allows a single task to live in multiple projects simultaneously, eliminating duplicate work and data silos. The platform also offers AI features through Work Intelligence, including AI-driven project risk predictions and intake and triage. For enterprise-grade control, Wrike provides the Wrike Lock add-on, giving organizations the rare ability to manage their own encryption keys for data stored in the cloud.

Find the best project management dashboard software for your team in this side-by-side comparison article. 

Zoho Projects

Zoho Projects is a cloud-based alternative to Microsoft Project, offering a lower barrier to entry for teams that need powerful but intuitive scheduling. It is well-suited for mid-sized to enterprise teams in construction, software development, and marketing that require a balance between traditional planning and collaborative flexibility. 

zoho projects dashboard

Here are some features available to Zoho Projects users:

  • Zia AI assistant for insights and assistance
  • Enterprise-grade security features including SAML-based SSO, multi-factor authentication, IP restrictions, and directory integrations
  • List, Gantt, Kanban, and Calendar project management views
  • Interactive Gantt chart with task dependencies, critical path analysis, baselines, and timeline controls
  • Data imports from Microsoft Project
  • Report and project data exports to PDF and Excel (XLS), with CSV support in some modules

The platform allows direct imports of Microsoft Project MPP files (2003, 2007, 2010, 2013 and 2016), ensuring that complex project data remains intact during migration. Once imported, teams can leverage features like interactive Gantt charts with critical path analysis and project baselines, alongside the Zia AI assistant for predictive task insights.

Learn more about finding the best Microsoft Project Online replacement

Compare Microsoft Project Alternatives

Platform

Enterprise Security Credentials

Interactive Gantt

Flexible Views

Import MS Project Files

Export to PDF & Excel

Platform

SmartsheetSOC 2 Type II, ISO 27001, ISO 27018, FERPA, HIPAAGrid, Table, Gantt, Timeline, Board, Card, Calendar
AsanaSOC 2 Type II, SOC 3, ISO 27001, ISO 27017, ISO 27018, ISO 27701, GDPR, HIPAAList, Board, Calendar, Timeline / Gantt 
ClickUpSOC 2 Type II, ISO 27001, ISO 27017, ISO 27018, PCI DSS, HIPAAGantt, Board, Calendar
Microsoft PlannerSOC 1/2, ISO 27001, ISO 27018, HIPAA, FISMA, HITRUST, IRS 1075Board, Grid, Schedule, Charts, with Timeline, People, GoalsExcel
monday.comSOC 1, SOC 2 Type II, SOC 3, ISO 27001, ISO 27017, ISO 27018, ISO 27701, HIPAATable, Gantt, Kanban, Calendar, Workload
OpenProjectSOC 2 Type II, ISO 27001, TISAXTable, Board, Calendar, Team Planner, Gantt Requires additional step
WrikeSOC 2 Type II, ISO 27001, ISO 27017, ISO 27018, ISO 27701, HIPAATable, Kanban, List, Gantt, Calendar
Zoho ProjectsSOC 2 Type II, ISO 27001, ISO 27017, ISO 27018, ISO 27701, HIPAA, PCI DSSList, Gantt, Kanban, Calendar

Project Management Functionality: An Expert’s View

Ian Reynolds is a partner at Zibtek, LLC, a global software development and digital marketing firm based in Utah. The company employs more than 200 engineers in the United States, the Philippines, and India, and creates high-performance software and web applications for companies ranging from enterprises to small businesses.

Because of the company’s far-flung workforce and its multiple projects, it’s critical for it to have a versatile, reliable project management tool.

Ian Reynolds

“If a tool doesn’t have what we need to coordinate and run our projects well, it’s not going to work over the long haul.” 

— Ian Reynolds, partner, Zibtek, LLC

Reynolds polled his employees, and they said they think the most critical functionality in any project management tool includes:

  • Calendar for tracking features
  • Gantt chart functionality
  • Ability to easily move tasks around to change priorities
  • Due dates
  • Ability to assign to specific people
  • Links to email to get notifications
  • Communication feature (i.e., chatting)
  • Screen sharing and recording
  • Easy file uploading

Discover Smartsheet: the Microsoft Project Alternative Your Team Will Actually Use

Empower your people to go above and beyond with a flexible platform designed to match the needs of your team — and adapt as those needs change. 

The Smartsheet platform makes it easy to plan, capture, manage, and report on work from anywhere, helping your team be more effective and get more done. Report on key metrics and get real-time visibility into work as it happens with roll-up reports, dashboards, and automated workflows built to keep your team connected and informed. 

When teams have clarity into the work getting done, there’s no telling how much more they can accomplish in the same amount of time. Try Smartsheet for free, today.

 

 

Disclaimer: The information found in this comparison article is sourced from vendor websites, community boards, and some third-party user reviews. AI tools were used to help conduct research.